The Balmoral Tower development is a new apartment block with a ground level car park. It consists of 6 levels of apartments and located in Wollongong.
Project Description:
- Radiant’s client for the project was Southern Cross construction.
- Frames used on this project consisted of both fire and non-rated and they were installed into block and stud walls.
- Doors used on this project were both the fire rated and non-rated with facing material that consisted of Duracote and MDF lining. The Comms and electrical doors have a metal lining to the inside face to make them a non-combustible door.
- This project consisted of about 300 doors and frames the KABA, Nova, Kilargo & Dorma brand door hardware installed throughout.