The UTS Function room development was an addition of new level to the roof of an existing building within the University of Technology Sydney. It consists of an open-air terrace and bar with a large function room that can be divided into 3 smaller rooms.
Project Description:
- Radiant’s client for the project was St Hillier’s construction.
- Frames used on this project consisted of both fire rated and non rated and they were installed into block and stud walls.
- Doors used on this project were both fire rated and non rated with facing material that consisted of Plywood lining and Blackbutt veneer.
- The project consisted of about 45 doors and frames with Lockwood, Dorma & Kilargo brand door hardware installed throughout.